Posts Tagged ‘trim’

More Center Section Fun

Thursday, May 8th, 2008

The F-633 R control mount replacement magically appeared on the front steps today. I promptly went downstairs, drilled and trimmed the part per the plans. Using my drill press this time around yielded a perfect result. I mounted both brackets and test fit the control arms. It all worked perfectly.

Tomorrow I will be drilling and riveting all the nutplates and … 

Tasks Completed:

  • Remade F633R
  • Mounted F633R to aft center bulkhead 

Final Emp. Assembly 2

Wednesday, February 6th, 2008

I need to source a 1/4″ metal tube in order to drill the elevator horns. Time to search some builder websites.

 

Tasks Completed:

  • Finished trimming HS skin to fit elevator counterbalance 

Final Emp. Assembly

Sunday, February 3rd, 2008

020308_emp_01.jpg

020308_emp_02.jpg

Tonight I got the horzontal stabilizer back out and began doing all the final assembly work before starting on the firewall. I am still going to wait to do the fiberglass till later.

Tasks Completed:

  • Fit elevators to stab.
  • Started trimming the stab skins to fit the

Left Elevator Final Assembly

Thursday, January 10th, 2008

011008_tt_16.jpg

Tasks Completed:

  • Riveted front half of trim tab hinge to left elevator
  • Riveted top of trim tab, spar and back half of hinge

Note: The trim tab has a slight upward curve caused by the misalignment of the top holes. I am not sure how the fit ended up being off slightly. This will be another item to ask the tech counselor about. Worst case, I’ll end up building Trim tab #3! I’ll save it for a rainy day in 2009!

Attaching Trim Tab

Monday, January 7th, 2008

010708_tt_10.jpg

Tonight I was able to get the trim tab clecoed into position on the left elevator. I am within 1/32″ of the trailing and inboard edges which I am pleased with. It looks as if the travel needed will be within spec once I get the bottom of the trim tab bend to clear the rivets in the elevator.

Tasks Completed:

  • Match drilled the forward hinge to the left elevator assembly
  • Trimmed inboard edge of hinge

Deburring and Servo Mount Drilling

Wednesday, November 14th, 2007

111407_le_02.jpg 

Tasks Completed:  

  • Deburred all the left elevator parts
  • Match drilled servo mount brakets to coverplate

NOTE: The measurement in Drawing 5 for the edge distance for the outboard servo bracket was off by about 1/32″. After checking on VAF, I found a number of folks with the same comment. I shifted my mark and drilled the coverplate.

E: Prep Work

Friday, September 14th, 2007

–Finished trimming vinyl

E: Stiffeners

Tuesday, September 11th, 2007

–Trimmed the E 720 J, K and L stiffeners
–Clecoed left stiffeners 

E: Prep Work

Wednesday, September 5th, 2007

–trimmed the vinyl on the left elevator skin

E: Stiffeners

Monday, September 3rd, 2007

–Made stiffeners for left and right elevators

I trimmed all the stiffeners tonight. I ran out of time so I was just able to mark the E 720 J,K,L stiffeners for extra trimmings