E: Drilling
Tuesday, October 30th, 2007- Drilled E701R skin, E713 and 709 ribs, and E702 spar
- Drilled aft 3 holes for right elevator tip to #30
- Diassembled right elevator
–Finished HS riveting
Final HS Punch List:
–Check skin edge for proper deburring (completed: 3.23.07)
–Torque rear spar bolts (completed 3.23.07)
–Touch up nicked primer
–Check front spar rivet (completed: 3.23.07)
–Check rear spar rivet (completed: 3.23.07)
–Rivet front tips left and right (completed 3.23.07)