Posts Tagged ‘roll’

Finished Left Elevator

Saturday, February 2nd, 2008

Tasks Completed:

  • Rolled left elevator leading edges
  • Drilled and riveted leading edges
  • Fit rod end bearings and jam nuts

Note: There is a badly seated pop rivet on the most outboard leading edge section. I’ll need to go back and repair later. 

Left Elevator Final Assembly 2

Saturday, January 12th, 2008

I am getting adept at rolling leading edges now. With the QB wing on order however, this should be my last one! I got the clecos in but the edges will need some more work before I can drill and rivet.

Tasks Completed:

  • Rolled and temp assembled the leading edges

Rud: Trailing Edge 3

Thursday, August 23rd, 2007

–Finished trailing edge riveting
–Started rolling leading edges 

The trailing edge was finished with very good results. It’s well within spec. I’m very happy overall.Next up was the leading edges.

After testing a number options, I used a 3/4″ wooden dowel to roll the edges. The rolling went ok, but I still can’t get the 2 edges close enough to cleco. Also in trying the leading edge to bend more I slightly creased the leading edges. I finally gave up for the night fearing I would screw more stuff up.