Posts Tagged ‘rib’
Monday, May 26th, 2008
I finished all the parts fabrication and drilling this evening for the center section. Now I’m ready to clean, etch, and prime all the parts for the firewall and the center section this week before my trip to Arizona.
Tasks Completed:
- Finished drilling the conduit holes in the cover support ribs.
- Fabricated the spacers out of the aluminum tubing.
Tags: conduit, drill, rib, spacer, tubing
Posted in Center section, Fuse | Comments Off
Sunday, September 30th, 2007
Warning: preg_replace_callback() [
function.preg-replace-callback]: Unknown modifier '|' in
/home/mulder18/public_html/wp-content/plugins/text-control/text-control/markdown.php on line
766
Tags: 713, 714, 720, counterbalance, debur, drill, rib, skin
Posted in Elevators, Empennage | No Comments »
Saturday, September 29th, 2007
Warning: preg_replace_callback() [
function.preg-replace-callback]: Unknown modifier '|' in
/home/mulder18/public_html/wp-content/plugins/text-control/text-control/markdown.php on line
766
Tags: , 713, 714, 720, debur, drill, rib, skin
Posted in Elevators, Empennage | No Comments »
Thursday, August 16th, 2007
–Continued Riveting rudder skin to skeleton
Tonight I worked on the the counterbalance skin and right side of the bottom rib and spar.
Tags: counterbalance, rib, rivet, skin, spar
Posted in Empennage, Rudder | No Comments »
Friday, May 25th, 2007
–Finished assembling rudder skeleton
–match drilled counterbalance skin
–match drilled ribs, rudder horn, and lower spar
I fixed the counterbalance skin fit problem by shaping the counterweight a little more and by starting the clecos from the front and working backwards.
Tags: assembly, cleco, counterbalance, drill, fix, rib, rudder horn, skeleton, skin, spar
Posted in Empennage, Rudder | No Comments »
Sunday, November 5th, 2006
–match drilled right HS skin, spars and ribs
–started deburring all the holes
Tags: debur, drill, rib, skin, spar
Posted in Empennage, Horz Stab | No Comments »
Friday, November 3rd, 2006
–Match drilled left HS skin, spars and ribs
Tags: drill, rib, skin, spar
Posted in Empennage, Horz Stab | No Comments »
Sunday, October 22nd, 2006
–Prepped VS rear spar stiffener
–Prepped VS ribs
–Drilled VS 410 bracket
Tags: 410, rib, spar, stiffener
Posted in Empennage, Vert Stab | No Comments »
Sunday, October 15th, 2006
–Prepped HS ribs
–Began drilling Left HS skeleton
–Started match drilling HS skin
Tags: debur, drill, rib, skeleton, skin
Posted in Empennage, Horz Stab | No Comments »
Saturday, October 14th, 2006

Tasks Completed:
- Test fit the HS skins
- Continued to prep the HS ribs
Tags: assembly, fit, rib, skin
Posted in Empennage, Horz Stab | No Comments »