E: Left Skeleton and Counterweight
Sunday, October 21st, 2007We just got back from a long weekend in Vegas. It was nice be in the warm desert before our winter really kicks into high gear. Now back to the project!
- Clecoed left elevator skeleton together
- Cut away right counterweight per plans
Note: Holes in the outboard right elevator spar doubler and the E701R spar are slightly off set by approx. 1/32″. I need to contact Van’s to confirm this is within tolerances. Update (11.20.07): Joe B. at Van’s says its no issue as long as no torsion is created in the spar by trying the force the clecoes in place (which is not happening in my case). Problem resolved.