Posts Tagged ‘hinge’

Left Elevator Final Assembly

Thursday, January 10th, 2008

011008_tt_16.jpg

Tasks Completed:

  • Riveted front half of trim tab hinge to left elevator
  • Riveted top of trim tab, spar and back half of hinge

Note: The trim tab has a slight upward curve caused by the misalignment of the top holes. I am not sure how the fit ended up being off slightly. This will be another item to ask the tech counselor about. Worst case, I’ll end up building Trim tab #3! I’ll save it for a rainy day in 2009!

Attaching Trim Tab

Monday, January 7th, 2008

010708_tt_10.jpg

Tonight I was able to get the trim tab clecoed into position on the left elevator. I am within 1/32″ of the trailing and inboard edges which I am pleased with. It looks as if the travel needed will be within spec once I get the bottom of the trim tab bend to clear the rivets in the elevator.

Tasks Completed:

  • Match drilled the forward hinge to the left elevator assembly
  • Trimmed inboard edge of hinge

Trim Tab Hinge Work

Sunday, January 6th, 2008

It proved to be a very busy first week back from the holidays at work. I forced myself to go down to the workshop tonight and get something done on the trim tab. The fuse kit is supposed to be ready for pickup the week of the 14th at Van’s, so I want to have the tail kit completed minus the fiberglass work by then.

Tasks Completed:

  • Aligned and clamped the front half of E721 hinge