Monday, January 7th, 2008

Tonight I was able to get the trim tab clecoed into position on the left elevator. I am within 1/32″ of the trailing and inboard edges which I am pleased with. It looks as if the travel needed will be within spec once I get the bottom of the trim tab bend to clear the rivets in the elevator.
Tasks Completed:
- Match drilled the forward hinge to the left elevator assembly
- Trimmed inboard edge of hinge
Tags: cleco, edge, flight controls, hinge, match drill, skin, tab, trim
Posted in Elevators, Empennage | No Comments »
Saturday, January 13th, 2007
–Finished HS riveting
Final HS Punch List:
–Check skin edge for proper deburring (completed: 3.23.07)
–Torque rear spar bolts (completed 3.23.07)
–Touch up nicked primer
–Check front spar rivet (completed: 3.23.07)
–Check rear spar rivet (completed: 3.23.07)
–Rivet front tips left and right (completed 3.23.07)
Tags: bolt, debur, edge, rivet, spar, tip, torque
Posted in Empennage, Horz Stab | No Comments »