Posts Tagged ‘Center section’
Center Section Prep
Sunday, April 20th, 2008With the size of the prefab’d center sections I just used the air drill to create the 5/8″ wire pass throughs in F704A and B. Actually I made the first one with the airdrill and almost screwed it up because of the high RPMs of the airdrill. I went back to the cordless at lower RPMs combined with some Boelube and got much better results.
Task Completed:
- Drilled wire pass throughson F704A and B
- Clecoed 704 assemblies together
Center Section Drilling
Wednesday, April 16th, 2008Tonight I started drilling the wire pass throughs in the center section parts. This requires expanding a small hole into a biggerhole using a unibit. I just purchased a benchtop drill press that should help with the smaller parts.
Tasks Completed:
- Drilled F704C and D wire pass-throughs
NOTE: The unibit in the drill press worked great except for shaving of a bit of the flange when the unibit got too close. Van’s says, “buff, prime, build on.” So I will.
Started Center Section
Tuesday, April 15th, 2008I went ahead tonight and started gathering all the parts for the center section bulkhed.
Tasks Completed:
- Prepped parts for center bulkhead