E: Priming Prep.
Saturday, October 27th, 2007- Washed, Acetoned, and Alumiprepped L and R stiffeners
–Trimmed the E 720 J, K and L stiffeners
–Clecoed left stiffeners
–Made stiffeners for left and right elevators
I trimmed all the stiffeners tonight. I ran out of time so I was just able to mark the E 720 J,K,L stiffeners for extra trimmings