Archive for the ‘Vert Stab’ Category

VS: Final Rivets

Saturday, March 24th, 2007

–Finished VS by riveting forward most tip rivets

VS: Riveting

Sunday, February 25th, 2007

–Riveted VS skin to skeleton
–Riveted rear spar to skin and skeleton 

VS: Drilling, Riveting

Saturday, February 24th, 2007

–Drilled VS 707 to 702 hole to #5
–Riveted VS 707 to 702
–Clecoed skin to VS skeleton 

VS: Rivet Repair

Sunday, February 18th, 2007

–Drilled out all 3 VS 707 to 702 rivets
–Straightened out VS 707 flange 

The fix worked out pretty well. The rib flange is only slightly deformed and the rivets are seated much better.

VS: Riveting

Saturday, February 17th, 2007

–Riveted VS rear spar and skeleton

Note: Bad rivet on VS 707 to 702 caused bending in the rib flange. I don’t like the looks of it and need to fix.

VS: Priming

Sunday, February 11th, 2007

–Primed VS parts

VS: Prep for Priming

Saturday, February 10th, 2007

–Etched VS parts with Alumiprep

VS: Cleaning, Prep

Sunday, February 4th, 2007

–Washed VS parts
–Acteone VS parts 

VS: Drilling, Deburring, Prep

Saturday, February 3rd, 2007

–Match drilled VS skin
–Deburred edges and holes of VS parts and skin 

HS, VS: Deburring, Assem.

Monday, November 6th, 2006

–Deburred HS parts
–Test fit VS skin