LE: Drilling, Counterweight

–Match drilled E610P and E702
–Clecoed E703 and 704 together
–Matchdrilled them to E702
–Shaped E714 and clecoed E713 into place.

NOTE: E610PP holes don’t quit align with E702 holes.They appear to be 1/32″ off. I emailed Van’s. They said if I can get the clecos on without distorting the spar, then its probably ok to drill. Build on…2 hours

Tags: , , , ,

Leave a Reply

Hours2.0