Archive for September 16th, 2007

E: Drilling, Deburring

Sunday, September 16th, 2007

–Match drilled left and right stiffeners to skins
–Deburred right elevator skins

Upon review, I don’t think I’ve been doing a good enough job deburring and rounding the edges of the skins thus far. Starting with the right elevator.