–Finished interior riveting of left HS assembly
–Started riveting of right HS assembly
Tags: assembly, left, right, rivet
This entry was posted
on Saturday, January 6th, 2007 at 9:47 pm and is filed under Empennage, Horz Stab.
You can follow any responses to this entry through the RSS 2.0 feed.
You can leave a response, or trackback from your own site.