HS: Riveting
Saturday, December 30th, 2006–Finished riveting HS front spar
–Started final assembly of HS
–Finished riveting HS front spar
–Started final assembly of HS
–Primed HS skins
–Started rivet front spar
–Finished riveting HS rear spar
–Began assembly of front spar
–Test fit pieces
–Began riveting rear spar
Note: Misfit lower rear spar stiffener. I had drill out 2 middle rivets. The holes became enlarged. I replaced with 5/32″ rivets.
–finished prepping all HS parts
–washed all HS parts
–acetoned all HS parts
–etched all HS parts with Alumiprep
–primed all HS parts with Napa 7220 Self Etch Primer
I debated what priming to use for a long time. After checking with Van’s recommends as well as the many online sources, I settled on rattle can self-etching primer. The convenience is a big factor. Although it technically needs a top sealer, this RV will be hangered and Van’s itself recognizes Mar Hyde self-etching primer. Good enough for me. This first round of priming I tried building a spray booth in the garage. Priming went well but the spry booth performed so-so. There was still a lot of paint fumes throughout the house and the booth itself didn’t vent really well at all. I am gonna have to try some mods before doing the VS parts.
–Cut elevator stop clearance in rear HS spar
–Deburred and dimpled HS skin holes
–Finished deburring HS skeleton
–Dimpled HS skins
The job and family kept me busy this past month. It felt good to dive back into the HS. Annabelle helped me dimple the skins tonight.