Front Spar Work

 100806_hs_07.jpg

Again I spent a lot of time studying the plans and VAF.

Tasks Completed: 

  • Bent HS 710 and 714
  • Began removing the flange from both HS 702s as per the instructions. 

Tags: , , ,

Leave a Reply

Hours4.0