Archive for October, 2006

VS: Drilling, Deburring, Prep

Sunday, October 22nd, 2006

–Prepped VS rear spar stiffener
–Prepped VS ribs
–Drilled VS 410 bracket 

HS, VS: Drilling, Deburring

Saturday, October 21st, 2006

–Match drilled right HS side
–Started VS assembly

Waiting to finish drilling the HS assembly until my Right Angle drill arrives from Cleveland Tools. 

HS: Right Assem.

Friday, October 20th, 2006

–Assembled right HS skeleton and skin 

HS: Deburring, Drilling

Sunday, October 15th, 2006

–Prepped HS ribs
–Began drilling Left HS skeleton
–Started match drilling HS skin 

Horizontal Stab. Assembly

Saturday, October 14th, 2006

 101406_hs_06.jpg

Tasks Completed: 

  • Test fit the HS skins
  • Continued to prep the HS ribs 

Rib Fun!

Tuesday, October 10th, 2006

Tasks Completed: 

  • Began deburring and scotchbriting HS ribs

Finishing HS Skeleton Prep

Sunday, October 8th, 2006

 101506_hs_05.jpg

Tasks Completed: 

  • Finished both HS 702 trimming
  • Dimpled, countersunk and bend HS 702s
  • Trimmed HS 404 

Front Spar Work

Saturday, October 7th, 2006

 100806_hs_07.jpg

Again I spent a lot of time studying the plans and VAF.

Tasks Completed: 

  • Bent HS 710 and 714
  • Began removing the flange from both HS 702s as per the instructions. 

More Rib Work

Sunday, October 1st, 2006

101006_hs_04.jpg 

Tasks Completed:

  • Continued Prepping HS Ribs