Drilling and Such
Saturday, September 23rd, 2006
I took my time on these parts to make sure I wasn’t overlooking something.
Tasks Completed:
- Match drilled HS608 and 609
- Match drilled HS412 and 413 hinge brackets
- Match drilled HS 411BFirst drilling tonight.