Archive for September, 2006

Filing Fun

Saturday, September 30th, 2006

093006_hs_03.jpg 

I used a hacksaw and metal file for this. I should go ahead and invest in some power tools.

Tasks Completed:

  • Finished tapers on HS710 and 714 

Forming HS710 and 714

Saturday, September 30th, 2006

093006_hs_02.jpg 

I studied the instructions and VAF for while before cutting and filing these parts. 

Tasks Completed:

  • Started tapering HS710 and 714 

Front Spar

Friday, September 29th, 2006

Task Completed: 

  • Match drilled front spar assembly

Drilling and Such

Saturday, September 23rd, 2006

092306_hs_04.jpg 

I took my time on these parts to make sure I wasn’t overlooking something. 

Tasks Completed:

  • Match drilled HS608 and 609
  • Match drilled HS412 and 413 hinge brackets
  • Match drilled HS 411BFirst drilling tonight. 

Horz. Stab. Rear Spar

Saturday, September 16th, 2006

091606_hs_01.jpg 

My job got in the way this week. but as Dan C. says in his site, it was very cool to see the first “piece” temporarily assembled. Now only a thousand more to go.

Tasks Completed:

  • Finished HS609PP prep
  • Clecoed rear spar assem. together 

More 609 Work

Sunday, September 10th, 2006

Task Completed: 

  • Continued to work on HS609PP

First Parts Prep

Saturday, September 9th, 2006

I hope I learn how to prep metal more efficiently. This step seems tedious.

Tasks Completed:

  • Started edging and polishing HS609PP 

Starting Line

Friday, September 8th, 2006

090806_g_01.jpg 

My Emp. Kit showed up on the front steps yesterday. After staring in awe last night, I opened it up tonight and inventoried both boxes. Everything was there. The only issue was a chip in the powder coating on one of the elevator horns.